INSTALLATION


METAL TO METAL SEATED VALVES

 Perform installation welding in accordance with ASME Boiler and Pressure Vessel Code, Sec. I, Part PW, or ANSI B31.1 Para 127.

   IMPORTANT:

A.  DO NOT DISASSEMBLE VALVE. Valve must be assembled and tightly closed during welding to protect seat from heat distortion and weld splatter.
B.  Allow 1/16" gap between bottom of socket, or butt weld end, and end of pipe (PW 41.5.7, or ANSI B31.1 Para 127.3.3).
C.  Preheat per Table 1.


SOFT SEATED VALVES

A.  Remove stem assembly as detailed in the REPAIR, section A, of these instructions, steps 1 - 4.
B.  Reassemble valve using Metal Disc Stem Assembly as detailed in the REPAIR, section G, of these instructions, steps 2 and 3,  a. through e.
C.  Follow INSTALLATION section above,  A through C.
D.  Follow steps A and B to put in Soft Seated Stem Assembly.

NOTE:
  For Soft Seated Check Valves you must remove the Disc and Spring and follow instructions for Soft Seated Valves.



TABLE 1
PREHEAT AND POSTWELD HEAT TREAT REQUIREMENTS

P-1
SA-105
P-5
SA-182 GR. F22
P-8
SA-182 GR. F316
PREHEAT
50° F
(A100.4.1)*
PREHEAT
400° F
(A100.4.4)*
PREHEAT
NONE REQUIRED
(A100.4.7)*
POST WELD HEAT TREAT
NONE REQUIRED
(PW-39)
POST WELD HEAT TREAT
REQUIRED WHEN NOMINAL
WALL THICKNESS EXCEEDS 5/8"
(PW-39)
LOCALIZED ONLY PER (PW-39-4-2)
POST WELD HEAT TREAT
NONE REQUIRED
(PW-39)
* ASME BOILER AND PRESSURE VESSEL CODE, SECTION I, PART PW-38